Analysis on output and start - up of shaanxi ferrosilicon enterprises in April
In April, the operation state of magnesium market was poor. In the middle of last year, the price continued to fall, and the lowest price dropped to 12800 yuan/ton for leaving the factory. As a result, the price of magnesium ingots dropped, leading to the unstable transaction of local 75# and the price decline.In terms of starting construction of silicon iron in shaanxi in April, sanjiang energy added one, and sanxin added one in the middle of this month.Haotian, jinchuan, jinleyuan maintenance furnace is still not open.In the second half of the production of wanyuan ferrosilicon, tianlong magnesium production reduction 1, heshun source production, moyuan production.Hengyuan overhauled one yesterday but will send a telegram to resume production tomorrow and the day after tomorrow.Other factories are working normally.
According to the network survey statistics, shaanxi in April 2020 in the production of iron and silicon enterprises 20, involving 33 ore furnace (including metal magnesium plant for their own use of iron and silicon furnace), in April operating rate of 68.75%, down 4.72% from march, the output is expected to be 65,900 tons, less than march of 5,700 tons, capacity release 65.18%.